
The installation and the construction of the photovoltaik system was done parallel to the world climate summit in Copenhagen Decmeber 7th till 19th. Icy conditions, a slippery roof and temperatures below zero celsius gave us a hard time. We wanted the work to be finished before the conference in Copenhagen ended. On Decmeber 17th we have flow over the ready installtion. The photovolataik system has been cable connected to the grid on 22/12/2012 and is producing clean energy since then.
